CRITERIA I
Key Indicator- 1.4 Feedback System (20)
Metric No. |
Key Indicator – 1.1 Curricular Planning and Implementation (20) |
Download |
1.1.1 |
The Institution ensures effective curriculum delivery through a well planned and documented process(10) |
|
1.1.2 |
The institution adheres to the academic calendar including for the conduct of CIE(5) |
|
1.1.3 |
Participation of Teachers activities related to curriculum development and assessment of the affiliating University(5) |
|
Metric No. |
Key Indicator- 1.2 Academic Flexibility(30) |
Download |
1.2.1 |
Percentage of Programmes in which Choice Based Credit System(CBCS)/ elective course system has been implemented(10) |
|
1.2.2 |
Number of Add on /Certificate programs offered by the institute(10) |
|
1.2.3 |
Average percentage of students enrolled in Add-on/Certificate programs (10) |
|
Metric No. |
Key Indicator- 1.3 Curriculum Enrichment (30) |
Download |
1.3.1 |
Institution integrates crosscutting issues into the Curriculum(10) |
|
1.3.2 |
AAvg. % of courses that include exp. learning through project work/field work/internship during last five years (10) |
|
1.3.3 |
Percentage of students undertaking project work/field work / internship (10) |
|
Metric No. |
Key Indicator- 1.4 Feedback System (20) |
Download |
1.4.1 |
Institution obtains feedback on the syllabus(10) |
|
1.4.2 |
Feedback process of the Institution(10) |
|